- October 14, 2025
Industry: Education
Location: Interlochen, Michigan
Description of Work: Laboratory Testing
Value: $7.3 M
Construction of the Interlochen Center for the Arts will begin on a new pedestrian tunnel that will run beneath J. Maddy Parkway (M-137), permanently connecting the Green Lake and Duck Lake sides of campus. The tunnel will be fully ADA-compliant and will provide students, faculty, and guests with a safe and seamless route between the two halves of Interlochen’s grounds.
